CMIT — Cai Mep International Container Terminal

Project type

Infrastructure · Maritime · Container Port

Date

Completed

Location

Cai Mep, Vietnam

Deep-water container port for Super Post-Panamax ships at Cai Mep, Vietnam — 48 ha port area, 600 m of berth structure with dredging, 30 ha of land reclamation and soil improvement, and a full operational building set (administration, workshop, customs, gates, power, water supply & treatment). Capacity ~1.2 million TEU per year. Engagement covered the full project lifecycle — basic design, approval design, tender documents, Design-Build contractor procurement (FIDIC Yellow Book, awarded to POSCO ENC), and construction supervision as Engineer under FIDIC.

Location: Cai Mep, Vietnam | GFA: 48 ha port area, 600 m berth, 30 ha land reclamation | Volume: USD 110 M (Design-Build Contract) | Service Phases: Basic Design → Construction Supervision (FIDIC Yellow Book) | Code Framework: Eurocode / DIN, TCVN, FIDIC | Status: Completed · 1.2 M TEU/year capacity | BEC Team: HCMC

BEC Services: Project Manager for Design-Build implementation · Design Management & Coordination — yard, marine, buildings, infrastructure · Employer's Requirements (ER) preparation & tender documentation · FIDIC Yellow Book tender process & contractor award · Engineer's services under FIDIC — design review & site supervision · HSSE Officer, Quality, Time & Non-Compliance Management · Claim & Variation Management, Acceptance & handing-over

Technical Highlights: Deep-water terminal for Super Post-Panamax vessels · 48 ha port, 600 m berth, 30 ha land reclamation · USD 110 M Design-Build contract awarded to POSCO ENC · 1.2 million TEU/year operational capacity · End-to-end role: planning, tender, FIDIC Engineer on site · Coordination of design review with back-office in Germany